PHOSPHATE CONVERSION COATINGS

 

HOME / SITE MAP / CONTACT

 

 

line decor
  
line decor
 


 

 
 
 


 
 

 

 


TUBE DRAWING ZINC PHOSPHATE LINE

 

1. Alkaline Degreaser

temperature           : 70 - 90 °C

treatment time       : 5 - 10 min.

tank material           : durable standat steel.

 

 

2. Water Rinse

temperature           : ambient

treatment time       : 0,5 - 1 min. 

tank material           : durable standat steel.

 

3. Acid Pickling

temperature           : ambient - 70 °C

treatment time       : 10 - 60 min.

tank material           : stainless steel, PP or PE.

 

4. Water Rinse

temperature           : ambient

treatment time       : 0,5 - 1 min. 

tank material           : durable standat steel.

 

5. Activation

temperature           : ambient

treatment time       : 0,5 - 1 min. 

tank material           : durable standat steel.

 

6. Zinc Phosphate

temperature           : 55 - 70 °C

treatment time       : 3 - 15 min. 

tank material           : stainless steel, PP or PE.

 

7. Water Rinse

temperature           : ambient

treatment time       : 0,5 - 1 min. 

tank material           : durable standat steel.

 

8. Protective Oiling / Reactive Soap

temperature           : ambient - 85 °C  

treatment time       : 0,5 - 5 min. 

tank material           : durable standat steel.

 

9. Drying

temperature           : max. 120 °C

treatment time       : 1 - 5 min. 

tank material           : durable standat steel.